翻訳と辞書
Words near each other
・ Thermal lance
・ Thermal laser stimulation
・ Thermal loop
・ Thermal low
・ Thermal management
・ Thermal management of electronic devices and systems
・ Thermal management of high-power LEDs
・ Thermal manikin
・ Thermal mass
・ Thermal mass flow meter
・ Thermal mass refrigerator
・ Thermal Micrometeoroid Garment
・ Thermal neutral zone
・ Thermal optimum
・ Thermal oxidation
Thermal Oxide Reprocessing Plant
・ Thermal oxidizer
・ Thermal pad
・ Thermal pad (disambiguation)
・ Thermal paper
・ Thermal physics
・ Thermal pollution
・ Thermal Power Plant 27
・ Thermal power plant Kolubara
・ Thermal power station
・ Thermal Power Station Kakanj, Catici
・ Thermal Power Station railway station
・ Thermal power stations in Russia and Soviet Union
・ Thermal printing
・ Thermal profiling


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Thermal Oxide Reprocessing Plant : ウィキペディア英語版
Thermal Oxide Reprocessing Plant

The Thermal Oxide Reprocessing Plant, or THORP, is a nuclear fuel reprocessing plant at Sellafield in Cumbria, England. THORP is owned by the Nuclear Decommissioning Authority and operated by Sellafield Ltd (which is the site licensee company). Spent nuclear fuel from nuclear reactors is reprocessed to separate the 96% uranium and the 1% plutonium, which can be reused in mixed oxide fuel, from the 3% radioactive wastes, which are treated and stored at the plant. The uranium is then made available for customers to be manufactured into new fuel.
THORP is due to close in 2018 once all existing reprocessing contracts have been fulfilled.
==History==

Construction of THORP started in the 1970s, and was completed in 1994. The plant went into operation in August 1997.
Between 1977 and 1978 an inquiry was held into an application by British Nuclear Fuels plc for outline planning permission to build a new plant to reprocess irradiated oxide nuclear fuel from both UK and foreign reactors. The inquiry was to answer three questions: "1. Should oxide fuel from United Kingdom reactors be reprocessed in this country at all; whether at Windscale or elsewhere? 2. If yes, should such reprocessing be carried on at Windscale? 3. If yes, should the reprocessing plant be about double the estimated site required to handle United Kingdom oxide fuels and be used as to the spare capacity, for reprocessing foreign fuels?". The result of the inquiry was that the new plant, the Thermal Oxide Reprocessing Plant, was given the go-ahead in 1978, although it was not completed until the 1990s at a cost of £1.8 billion.
In 1998/99, the plant faced severe economic difficulties when it failed to reach its reprocessing targets. Shut-downs for six months in the first half of 1998 and for several further months from December 1998, due to leakages, resulted in a failure to achieve the target of reprocessing 900 tonnes of fuel over that period. Most of the reprocessing contracts were with Germany and Japan.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Thermal Oxide Reprocessing Plant」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.